The Province House restoration dishes up an new serving of visually interesting sketch material every day. We are currently in the sunny period leading up to the installation of the exoskeleton (the prospect of which almost makes my brain explode with possibility). And so a trench has been dug almost all the way around, exposing the foundation (and taking away with it many of the minor stairways). And so the trench doesn’t fill with rainwater, a complex network of drainpipe extensions has been installed.
Add new comment